Case Study: Battery

Example for a pack assembly line

Processes:

  • Loading station
  • Preparing station (cooling system, BMS installation, gluing station)
  • Screwing station
  • Isolation station
  • EOL station

Cycle time: 20 min/pack

Back to overview